Standard Crew - 6 persons, Total bunks - 14 mess galley, stores, WC’s and showers
Crane
30t Link Belt TC8030 Crane
Fuel
MGO
Condition / Comments
They have prepared the vessel, with a total investment of 300,000 euros. This includes a new tow wire and equipment (wire lock, protector, triangle, etc.), engine maintenance, and preparations for the engine room and deck
Standard Crew - 6 persons, Total bunks - 14 mess galley, stores, WC’s and showers
Crane
30t Link Belt TC8030 Crane
Fuel
MGO
Condition / Comments
They have prepared the vessel, with a total investment of 300,000 euros. This includes a new tow wire and equipment (wire lock, protector, triangle, etc.), engine maintenance, and preparations for the engine room and deck
The vessel has undergone extensive refits, including new engines, overhauled gearboxes, replaced pumps and sensors, new navigation and radar equipment, upgraded safety equipment, and much more
The vessel has undergone extensive refits, including new engines, overhauled gearboxes, replaced pumps and sensors, new navigation and radar equipment, upgraded safety equipment, and much more
recently used for underwater hydrotechnical works, divers' assistance, so it has deck equipment that serves that like a HDS 500kg crane and a gangway for divers to go under the water
recently used for underwater hydrotechnical works, divers' assistance, so it has deck equipment that serves that like a HDS 500kg crane and a gangway for divers to go under the water